Search public information

Results for “Palmyra”

Search questions, communities, public records, documents, projects, official source systems and Missouri’s Watch & Listen directory. Results remain source-labeled and neutral by default.

Search covers all Missouri. Open public records for Palmyra.

Ordering note: Most Asked reflects question interest only. It does not imply importance, guilt, quality or editorial priority.

Connected public systems

5 results

A–Z
Project

DZTM 345-kV corridor — PSC-approved route; Adair County road and easement negotiations

The Missouri PSC order of July 16, 2025 (effective August 15) granted Ameren Transmission Company of Illinois a conditional CCN for the Denny–Zachary–Thomas Hill–Maywood (DZTM) project, including the Denny–Zachary double-circuit route. It permitted a future transfer of an undivided 49% asset interest to the Missouri Electric Commission, but does not prove the transfer occurred. Adair County Commission minutes of September 15, 2026 record statements from Ameren representatives that all Denny–Zachary easements except one in Sullivan County had reportedly been signed, clearing was expected November 2026–January 2027 and construction in 2027. A county road-use agreement, $70,000 protection escrow, dust control and NEMO Fairgrounds haul routes were discussed, not approved or funded in these minutes. No current clearing, complete easements, filed condemnation outcome or signed road agreement is verified. Macon Chronicle reporting dated October 6 says ATXI filed a third Macon County condemnation petition on October 5, 2026 (case 26MA-CC00064), seeking permanent easements over 16 parcels, alongside two August petitions. This is attributed reporting about a petition, not independently verified court relief, an executed easement, or judgment.

PSC CCN Authorized In 2025; Sept 2026 County Discussions Official; Oct 2026 Macon Condemnation Petitions Attributed To Local Court Reporting; Judgment/Construction Unverified · Adair County; Daviess County; DeKalb County; Grundy County; Knox County; Lewis County; Macon County; Marion County; Randolph County; Sullivan CountySep 15, 2026
Project

Marion County — Mark Bottoms transmission rebuild and flood-resilience corridor

Northeast Missouri Electric Power Cooperative describes a transmission rebuild in and around the Mark Bottoms north of Palmyra. Its official project page specifies approximately 12.2 miles of existing 161-kV lines and 6.7 miles of 69-kV line to be reconstructed, with some relocation/co-location to shared corridors using wood H-frame structures and steel monopoles. The cooperative identifies improved reliability during flooding as a goal. Exact event/announcement date, executed easements, permits, final construction timetable and completed work are not verified; this is older undated official project evidence newly incorporated, not a November 2026 project approval.

Utility-Described Planned Line Rebuild And Co-Location; Construction And Easement Status Unverified · Marion CountyNov 17, 2026
Community

Palmyra

Canonical Missouri place from the 2024 U.S. Census Bureau Gazetteer.

Published place recordSep 27, 2026

Missouri voices

1 Watch & Listen result

A–Z

Source-linked creators across platforms, alongside podcasts, video and radio. Source checks establish directory metadata; external playback and content claims have not been independently verified.

Filter these directory results →