Search public information

Results for “Kirksville”

Search questions, communities, public records, documents, projects, official source systems and Missouri’s Watch & Listen directory. Results remain source-labeled and neutral by default.

Search covers all Missouri. Open public records for Kirksville.

Ordering note: Most Asked reflects question interest only. It does not imply importance, guilt, quality or editorial priority.

Connected public systems

53 results

A–Z
Project

Adair and Sullivan — Zachary–Locust Creek 33-mile co-located 161/345-kV transmission corridor

Northeast Missouri Electric Power Cooperative and NW Electric Power Cooperative's October 2025 factsheet describes a 33-mile route from Zachary Substation south of Kirksville (about 15 miles in Adair County) to Locust Creek Substation west of Milan (about 18 miles in Sullivan County), sharing a corridor with Ameren Transmission Company of Illinois (ATXI). Proposed double-circuit steel monopoles support a cooperative 161-kV line and ATXI 345-kV line. The document specifies overlapping cooperative 100-foot and ATXI 150-foot easements, for a maximum combined corridor width of 150 feet (not 250). Construction is dependent on ATXI's schedule and not independently confirmed begun.

Coordinated Utility Design And Easement Acquisition Period; Actual Signed Easements And Current Construction Status Unverified · Adair County; Sullivan CountyNov 17, 2026
Project

Adair County — AES Morris Solar marked operational after 2025 construction

AES currently describes Morris Solar as operational and labels 2025 as its operating-phase year; the company lists 250 MW planned capacity. Adair County's January 31, 2025 report described construction nearing completion and anticipated testing in May. This reconciles the earlier construction-only baseline with a now-operational plant, but these sources do not fix an exact commercial-operation date or verify the final as-built capacity. AES projects $8.8 million in local tax revenue; that is a company forecast, not audited receipts. AES also describes more than 340 jobs during peak construction, not ongoing permanent jobs.

AES Currently Identifies Operational Facility; Exact Commissioning Day And As-Built Capacity Not Independently Confirmed · Adair CountyNov 20, 2026
Document

American School of Osteopathy early governance records, 1892-1916

Missouri Digital Heritage lists American School of Osteopathy record books from 1892-1916 documenting incorporation, early board governance, faculty proceedings, rules and regulations, and the people who shaped the profession in Kirksville.

Source Verified · Missouri Digital Heritage / Museum of Osteopathic MedicineJan 1, 1892
Document

Citizen Portal summary — Aug. 4, 2025 Benton OMR selection

AI-generated secondary summary of the Aug. 4, 2025 Kirksville City Council meeting reporting that Public Works Director Adam Dorrell presented a staff selection of Benton Engineering from four qualifications submissions for a water-treatment OMR facility plan. Primary City meeting materials should be obtained before treating the detailed selection narrative as fully verified.

Source Verified · Citizen PortalAug 14, 2026
Document

City Council Policy #30 — Record Management

Three-page City Council policy defining municipal record retention and identifying the City Clerk as records custodian. The policy states that public access is governed by Missouri Chapter 610. Verified from the official city PDF on 2026-09-13.

Source Verified · City of KirksvilleDec 20, 2021
Document

City of Kirksville — Data-center zoning review notice

Official municipal notice documenting the July 27, 2026 Council resolution to prepare data-center zoning standards. It states that no data-center proposal had reached City Hall as of July 28, 2026. It does not identify a developer, parcel, power demand, water demand, agreement, incentive package, or later Council adoption.

Official Copy · City of KirksvilleJul 28, 2026
Document

City of Kirksville — November 16, 2026 City Council study-session official notice

Official alert issued November 13 at 9:44 a.m. CST explicitly schedules November 16, 2026, 4:00 p.m. study session in City Hall Council Chambers, 201 S Franklin St, Kirksville, Missouri. Tentative agenda is directed to the council document repository; meeting-specific agenda topics and online participation not confirmed. This notice supersedes older general listings of 6 p.m., without claiming a formally adopted rescheduling action.

Official Copy · City of KirksvilleNov 16, 2026
Document

Current M-2 Heavy Industrial Zoning Map

Official map attachment depicting M-2 zoning for policy review. It is not a project-site map and does not identify a proposal, applicant or parcel.

Official Copy · City of Kirksville Planning and Zoning CommissionSep 16, 2026
Document

Data Center Zoning Amendments Staff Report

Official staff report dated September 16, 2026 describing the citywide zoning review, its rationale and expected next steps. It states that no developer had approached the City and does not establish any project-specific facts or later meeting outcome.

Official Copy · City of Kirksville Planning and Zoning CommissionSep 16, 2026
Project

DZTM 345-kV corridor — PSC-approved route; Adair County road and easement negotiations

The Missouri PSC order of July 16, 2025 (effective August 15) granted Ameren Transmission Company of Illinois a conditional CCN for the Denny–Zachary–Thomas Hill–Maywood (DZTM) project, including the Denny–Zachary double-circuit route. It permitted a future transfer of an undivided 49% asset interest to the Missouri Electric Commission, but does not prove the transfer occurred. Adair County Commission minutes of September 15, 2026 record statements from Ameren representatives that all Denny–Zachary easements except one in Sullivan County had reportedly been signed, clearing was expected November 2026–January 2027 and construction in 2027. A county road-use agreement, $70,000 protection escrow, dust control and NEMO Fairgrounds haul routes were discussed, not approved or funded in these minutes. No current clearing, complete easements, filed condemnation outcome or signed road agreement is verified. Macon Chronicle reporting dated October 6 says ATXI filed a third Macon County condemnation petition on October 5, 2026 (case 26MA-CC00064), seeking permanent easements over 16 parcels, alongside two August petitions. This is attributed reporting about a petition, not independently verified court relief, an executed easement, or judgment.

PSC CCN Authorized In 2025; Sept 2026 County Discussions Official; Oct 2026 Macon Condemnation Petitions Attributed To Local Court Reporting; Judgment/Construction Unverified · Adair County; Daviess County; DeKalb County; Grundy County; Knox County; Lewis County; Macon County; Marion County; Randolph County; Sullivan CountySep 15, 2026
Document

K-REDI Board and investors

Current K-REDI board and investor page documenting government, institutional, utility, banking, healthcare and business participation.

Official Copy · Kirksville Regional Economic Development, Inc.Aug 14, 2026
Document

K-REDI business incentives

K-REDI description of state and local incentive tools including EEZ abatements, City revolving loans, fee waivers, industrial-park land and infrastructure grants.

Official Copy · Kirksville Regional Economic Development, Inc.Aug 14, 2026
Document

K-REDI current board and investor roster

Current K-REDI roster showing City and County public officials, Ameren Missouri as a Platinum investor and board representation, and AES as a Silver investor.

Official Copy · Kirksville Regional Economic Development, Inc.Aug 15, 2026
Document

K-REDI Investor Program

Official K-REDI investor-program brochure describing membership levels and investor benefits.

Official Copy · Kirksville Regional Economic Development, Inc.Jul 1, 2018
Document

K-REDI legacy members and board page

Legacy K-REDI page preserving a historical board roster that includes Jack Magruder and multiple institutional/business representatives.

Official Copy · Kirksville Regional Economic Development, Inc.Aug 14, 2026
Community

Kirksville

Verified automatically against U.S. Census Bureau TIGERweb.

Published place recordSep 27, 2026
Project

Kirksville data-center zoning: Chapter 44 draft under review

The City Council resolved on July 27 to develop data-center zoning standards. City staff then published proposed Chapter 44 revisions for the September 16 Planning and Zoning hearing, including a proposed special-use permit process. The proposal applies to Kirksville city limits only. The city said on July 28 that no data-center proposal had reached City Hall; the September 16 staff report likewise reported no developer approach. The draft is not an enacted ordinance or a project approval. The September 16 recommendation or vote has not been verified from city minutes, and the September 28 Council agenda does not list a data-center zoning action.

Proposed Zoning Text; September 16 Hearing Outcome Unverified; Council Adoption Unverified · Adair CountySep 16, 2026
Project

MoDOT awarded $807,191 for three Adair County resurfacing segments around Kirksville

The Missouri Highways and Transportation Commission awarded W. L. Miller Company an $807,191 resurfacing contract for Route H from LaHarpe Street to Missouri Route 11 in Kirksville, Route P from Business Route 63 to U.S. Route 63, and Route P from 0.3 mile east of U.S. Route 63 to Bass Way near Kirksville. MoDOT identifies the projects as part of the Governor’s Rural Roads Program funded through fiscal-year 2026 state general revenue.

Contract Awarded; 2026 Construction Program · Adair CountyDec 3, 2025
Project

U.S. 63 conceptual study between Kirksville and Iowa line: final alternatives work underway

MoDOT is conducting a conceptual study of U.S. 63 between the Iowa state line and south of Kirksville. Public meetings and the May 12–25, 2026 comment period are complete, and final purpose-and-need/conceptual alternatives are in progress for fall 2026. MoDOT states there is currently no construction funding and no implementation timeline has been determined, so this should be treated as a planning study rather than an approved construction project.

Final Conceptual Alternatives In Progress · Schuyler County; Adair CountyNov 1, 2025
Project

Who wrote Missouri’s data-center rules? Shared wording, documented preparers and open origins

Kirksville’s September 16, 2026 staff report names Diane Albrecht, City Planner, as preparer and credits staff research, Planning and Zoning recommendations, Council discussion, City Attorney and Missouri Municipal League input. Distinctive portions of its draft appear in records from Branson, Brentwood, Cass County, Festus, Joplin, Perryville and Warrensburg. Branson’s October 8, 2024 terminology amendment reproduces the engineer-report wording; Plano’s 2025 compilation attributes an earlier shorter definition to Ordinance 2010-10-15. These records establish shared wording, not one original author or a complete transmission chain. The site’s earlier summary has no named author record. Full dated comparison and source receipt: https://greentopreporter.com/research/data-center-language

Documented Wording; Original Authorship Unresolved; Kirksville Draft Is Not Verified Enacted · Statewide comparisonOct 6, 2026

Missouri voices

7 Watch & Listen results

A–Z

Source-linked creators across platforms, alongside podcasts, video and radio. Source checks establish directory metadata; external playback and content claims have not been independently verified.

Filter these directory results →