Search public information

Results for “Adair County”

Search questions, communities, public records, documents, projects, official source systems and Missouri’s Watch & Listen directory. Results remain source-labeled and neutral by default.

Ordering note: Most Asked reflects question interest only. It does not imply importance, guilt, quality or editorial priority.

Connected public systems

61 results

A–Z
Project

Adair and Schuyler — High Prairie wind center seeks new 30-year federal wildlife permit

Ameren Corporation's Form 10-Q filed November 6, 2026 confirms that Union Electric Company d/b/a Ameren Missouri applied to the U.S. Fish and Wildlife Service in March 2026 for a new 30-year federal permit supporting continued operations at the High Prairie wind facility in Adair and Schuyler counties. The current permit expires in May 2027. Ameren says nighttime operations have been curtailed April–October since 2021 for protected species, and explicitly states approval of the new application is uncertain. The complete 2026 application and any changed permit terms have not been independently reviewed; filing does not equal approval.

March 2026 Federal Permit Application Disclosed; USFWS Approval Or Revised Operating Conditions Unverified · Adair County; Schuyler CountyNov 17, 2026
Project

Adair and Sullivan — Zachary–Locust Creek 33-mile co-located 161/345-kV transmission corridor

Northeast Missouri Electric Power Cooperative and NW Electric Power Cooperative's October 2025 factsheet describes a 33-mile route from Zachary Substation south of Kirksville (about 15 miles in Adair County) to Locust Creek Substation west of Milan (about 18 miles in Sullivan County), sharing a corridor with Ameren Transmission Company of Illinois (ATXI). Proposed double-circuit steel monopoles support a cooperative 161-kV line and ATXI 345-kV line. The document specifies overlapping cooperative 100-foot and ATXI 150-foot easements, for a maximum combined corridor width of 150 feet (not 250). Construction is dependent on ATXI's schedule and not independently confirmed begun.

Coordinated Utility Design And Easement Acquisition Period; Actual Signed Easements And Current Construction Status Unverified · Adair County; Sullivan CountyNov 17, 2026
Community

Adair County

Verified automatically against U.S. Census Bureau TIGERweb county geography.

Published place recordSep 27, 2026
Project

Adair County — AES Morris Solar marked operational after 2025 construction

AES currently describes Morris Solar as operational and labels 2025 as its operating-phase year; the company lists 250 MW planned capacity. Adair County's January 31, 2025 report described construction nearing completion and anticipated testing in May. This reconciles the earlier construction-only baseline with a now-operational plant, but these sources do not fix an exact commercial-operation date or verify the final as-built capacity. AES projects $8.8 million in local tax revenue; that is a company forecast, not audited receipts. AES also describes more than 340 jobs during peak construction, not ongoing permanent jobs.

AES Currently Identifies Operational Facility; Exact Commissioning Day And As-Built Capacity Not Independently Confirmed · Adair CountyNov 20, 2026
Project

Adair County — Citrine Solar 40-MW proposal and county-documented Pasture Lane road work

Azimuth Renewables describes the Citrine Solar project as a proposed 40-MWac photovoltaic facility on 317 acres of agricultural/wooded land in Adair County, 304 acres of which would be fenced. Official Adair County minutes of April 16, 2025 place the project on Pasture Lane and record discussion of road protections, decommissioning and possible Chapter 100 bonds without action. September 21, 2026 county minutes report commissioners checking Pasture Road for Citrine Solar work. This establishes county-observed project-related road activity, not completed facility construction, operation, permit approval or executed financial incentives. The developer page still projects completion by December 2025; that forecast is outdated and must not be treated as achieved. Projected taxes above $5 million are developer estimates, not receipts.

Developer-Announced 40-MW Solar Project; Project-Related Road Work Noted By County September 21, 2026; Commercial Operation, County Approvals And Payments Unverified · Adair CountySep 21, 2026
Project

Adair County — High Prairie turbine collapse reported west of Willmathsville October 24

KTVO reporting dated October 24, 2026 (republished by National Wind Watch October 25) describes a High Prairie turbine collapse west of Willmathsville in Adair County. The report attributes to Ameren Missouri a response securing the site, no reported injuries and an ongoing assessment. Incident cause, the turbine model, investigation conclusions, repair costs and any operating restrictions were not independently established from a regulator or direct operator document.

Local Television-Reported Turbine Collapse; Operator Assessment Reported; Official Findings Unavailable · Adair CountyOct 24, 2026
Document

Adair County 1870 railroad bond election notice

SHSMO catalogs the March 29, 1870 Adair County election on a $100,000 bond subscription to the Quincy, Missouri and Pacific Railroad Company, a historical example of voters deciding public financing for infrastructure.

Source Verified · State Historical Society of MissouriMar 29, 1870
Document

Adair County 2025 Budget

Official 2025 county budget, including schedule of 2024 federal-award expenditures and county appropriations.

Official Copy · Adair County CommissionJan 30, 2025
Document

Adair County 2026 Budget

Official 2026 county budget, including 2025 federal-award expenditures, local-agency appropriations, Human Resource/Grant Writer costs, assessed valuation, debt and fund appropriations.

Official Copy · Adair County CommissionJan 30, 2026
Document

Adair County Agri-Ready designation announcement

County-published announcement of Agri-Ready designation, citing Missouri Department of Agriculture economic-contribution estimates for agriculture, food and forestry in Adair County.

Official Copy · Adair County Commission / Missouri Farmers CareFeb 17, 2025
Document

Adair County Commission — April 2026 minutes (solar and Pasture Lane)

Official April 2026 commission minutes. April 1: Birch Creek Energy proposed Pasture Lane road-use arrangements, submitted for legal review. April 20: commissioners discussed three other anticipated Adair County solar projects with school officials; projects not named. April 29: no vote or road-use agreement approval listed. These entries do not prove any solar permit, executed contract, construction completion or land transfer.

Official Copy · Adair County CommissionNov 18, 2026
Document

Adair County Commission — September 15, 2026 DZTM road-use minutes

Official commission minutes, page 182: Ameren representatives discussed Denny-Zachary easements, prospective clearing/construction, potential $70,000 road-protection escrow, dust control and NEMO Fairgrounds haul-route concerns. Not evidence of executed escrow or final road-use contract.

Official Copy · Adair County CommissionSep 15, 2026
Public record

Adair County Commission current meeting packet and vote records — records needed

Current approved Commission minutes after May 2026, meeting agendas and packets, attendance, motion makers and seconders, individual or roll-call votes when recorded, adopted ordinances and resolutions, bids, contracts, invoices and payment records are still needed for direct integration into the Reporter meeting and vote tracker.

Records Needed · Adair County Commission / Adair County ClerkAug 23, 2026
Public link not available
Document

Adair County Commission Minutes — August 2026

Official 14-page scanned August 2026 minutes packet. It contains twelve convened Commission records dated August 3–31 and one August 5 notice that the Commission was not in session. The packet was reviewed page by page; unsupported votes or outcomes were not inferred. Source-link correction 2026-09-23: replaced the general Commissioners’ Minutes index URL with this month’s direct controlling PDF. Prior URL preserved for audit: https://adaircountymissouri.com/departments/commission/commissioners-minutes/

Official Copy · Adair County CommissionAug 1, 2026
Document

Adair County Commission Minutes — July 2026

Official 18-page July 2026 minutes packet. The packet begins with June 30 adjourned-session minutes and contains July 1–29 Commission records. Facts are recorded only where the minutes establish them. Source-link correction 2026-09-23: replaced the general Commissioners’ Minutes index URL with this month’s direct controlling PDF. Prior URL preserved for audit: https://adaircountymissouri.com/departments/commission/commissioners-minutes/

Official Copy · Adair County CommissionJul 1, 2026
Document

Adair County Commission public meeting notices and agendas - October 19-21, 2026

Official three-page notice and tentative agenda packet for the October 19, 20 and 21, 2026 regular public meetings. Pages 1, 2 and 3 correspond to the three dates respectively. Each meeting starts at 8:30 a.m. at the Adair County Courthouse. The notice states it will be posted by October 15, 2026 at 4:30 p.m.; the actual posting time is not established. Inspected October 16, 2026. No meeting end time is given.

Official Copy · Adair County CommissionOct 16, 2026
Document

Adair County Commission public meeting notices and agendas - October 26-28, 2026

Official three-page notice and tentative agenda packet for the October 26, 27 and 28, 2026 regular public meetings. Pages 1, 2 and 3 correspond to the three dates respectively. Each meeting starts at 8:30 a.m. at the Adair County Courthouse. The notices state they will be posted by October 22, 2026 at 4:30 p.m.; actual posting time is not established. Visually inspected October 23, 2026. No meeting end time is given.

Official Copy · Adair County CommissionOct 23, 2026
Document

Adair County Commission Resolution 2026-1 — large-scale facility standards review

Official county resolution, passed September 1, 2026, declaring an intent to review where large-scale technology and renewable facilities may be located and what standards may apply. The county states it has no zoning regulations for development of large-scale facilities to meet technology needs. This resolution itself establishes no zoning limits or project approval.

Official Copy · Adair County CommissionSep 1, 2026
Document

Adair County community long view

Living source-backed graph of Adair County population, major projects, public money and decision markers. Historical points are added only when a public source verifies them.

Source Verified · Greentop ReporterAug 24, 2026
Project

Adair County passes resolution to review data-center and large-facility standards

On September 1, the Adair County Commission passed Resolution 2026-1 declaring an intent to review possible standards for large-scale technology and renewable facilities, including data centers and cryptocurrency facilities. The county says it has no zoning regulations for development of large-scale facilities to meet technology needs. The review topics include districts, setbacks and scale, screening, noise, water conservation, electrical coordination, backup generators and fuel, traffic and construction, and safety. No numeric limits, ordinance, permit, application or project approval were adopted in this resolution.

Resolution Passed — Potential Standards Under Review; No Zoning Rule Enacted · Adair CountySep 1, 2026
Public record

Adair County Resolution 2026-1 — review of large-scale facility standards

The Commission passed a resolution declaring its intent to review possible location and operating standards for large-scale technology and renewable facilities, including data centers. It calls out setbacks, building scale, screening, noise, water use, utilities, backup generators, traffic, construction and safety as review topics. It adopts no standards, identifies no applicant or site, and sets no hearing or comment deadline.

County Resolution · Adair County CommissionSep 1, 2026
Document

Adair County women volunteer for World War I defense work

Missouri Digital Heritage describes more than 325 volunteer registration cards from Adair County women who offered skills and service to the National Council of Defense during World War I. The collection is evidence of organized civilian participation and local capacity during a national emergency.

Source Verified · Missouri Digital Heritage / Truman State UniversityJan 1, 1917
Community

Brashear

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Community

Connelsville

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Project

DZTM 345-kV corridor — PSC-approved route; Adair County road and easement negotiations

The Missouri PSC order of July 16, 2025 (effective August 15) granted Ameren Transmission Company of Illinois a conditional CCN for the Denny–Zachary–Thomas Hill–Maywood (DZTM) project, including the Denny–Zachary double-circuit route. It permitted a future transfer of an undivided 49% asset interest to the Missouri Electric Commission, but does not prove the transfer occurred. Adair County Commission minutes of September 15, 2026 record statements from Ameren representatives that all Denny–Zachary easements except one in Sullivan County had reportedly been signed, clearing was expected November 2026–January 2027 and construction in 2027. A county road-use agreement, $70,000 protection escrow, dust control and NEMO Fairgrounds haul routes were discussed, not approved or funded in these minutes. No current clearing, complete easements, filed condemnation outcome or signed road agreement is verified. Macon Chronicle reporting dated October 6 says ATXI filed a third Macon County condemnation petition on October 5, 2026 (case 26MA-CC00064), seeking permanent easements over 16 parcels, alongside two August petitions. This is attributed reporting about a petition, not independently verified court relief, an executed easement, or judgment.

PSC CCN Authorized In 2025; Sept 2026 County Discussions Official; Oct 2026 Macon Condemnation Petitions Attributed To Local Court Reporting; Judgment/Construction Unverified · Adair County; Daviess County; DeKalb County; Grundy County; Knox County; Lewis County; Macon County; Marion County; Randolph County; Sullivan CountySep 15, 2026
Community

Gibbs

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Public record

Greentop April 7, 2026 municipal election — aldermen and use tax

Schuyler County Times reports Keaton Nelson received 26 votes and Ashley Robeson 25, ahead of Terry Mark (22), Martha Chapman (17) and Debbi McGee (13), and reports the Greentop use tax passed 38–17. Adair County’s official election archive confirms Greentop alderman and use-tax contests were on an Adair County ballot. Because Greentop appears across local election-authority records, the Reporter has not yet obtained a single official combined certification document and labels the numerical result as source-reported pending that primary record.

Election Result · Local election authoritiesApr 7, 2026
Community

Kirksville

Verified automatically against U.S. Census Bureau TIGERweb.

Published place recordSep 27, 2026
Document

Kirksville City Council — official November 23, 2026 meeting and executive-session notice

Official November 20, 2026 alert announces a public City Council meeting Monday November 23 at 6:00 p.m. CST in City Hall Council Chambers, 201 S. Franklin St., Kirksville, Adair County, followed by an executive session. It refers to a separate tentative agenda repository without listing topics; closed-session occurrence and outcomes unverified.

Source Verified · City of KirksvilleNov 23, 2026
Project

Kirksville data-center zoning: Chapter 44 draft under review

The City Council resolved on July 27 to develop data-center zoning standards. City staff then published proposed Chapter 44 revisions for the September 16 Planning and Zoning hearing, including a proposed special-use permit process. The proposal applies to Kirksville city limits only. The city said on July 28 that no data-center proposal had reached City Hall; the September 16 staff report likewise reported no developer approach. The draft is not an enacted ordinance or a project approval. The September 16 recommendation or vote has not been verified from city minutes, and the September 28 Council agenda does not list a data-center zoning action.

Proposed Zoning Text; September 16 Hearing Outcome Unverified; Council Adoption Unverified · Adair CountySep 16, 2026
Community

Millard

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Public record

Missouri House District 3 — current officeholder and district coverage

Official Missouri House records identify Danny Busick as the current representative for House District 3. The House describes the district as Sullivan, Mercer and Putnam counties plus western Adair County. This record establishes the officeholder and district coverage only; campaign, financial and relationship records are tracked separately.

Elected Official Record · Missouri House of RepresentativesAug 18, 2026
Project

MoDOT awarded $807,191 for three Adair County resurfacing segments around Kirksville

The Missouri Highways and Transportation Commission awarded W. L. Miller Company an $807,191 resurfacing contract for Route H from LaHarpe Street to Missouri Route 11 in Kirksville, Route P from Business Route 63 to U.S. Route 63, and Route P from 0.3 mile east of U.S. Route 63 to Bass Way near Kirksville. MoDOT identifies the projects as part of the Governor’s Rural Roads Program funded through fiscal-year 2026 state general revenue.

Contract Awarded; 2026 Construction Program · Adair CountyDec 3, 2025
Project

Northeast Missouri aquifer mapping includes Schuyler and is expanding across the region

Missouri DNR’s Northeast Missouri Aquifer Characterization Project covers nine counties: Clark, Scotland, Schuyler, Lewis, Knox, Adair, Marion, Shelby and Macon. DNR says electromagnetic surveys began in 2025 in Clark, Scotland and Schuyler counties and expanded into Adair, Knox and Lewis in summer 2026. The project combines test holes, passive seismic work and airborne electromagnetic surveys to identify suspected buried-channel aquifers and possible potable groundwater sources. DNR says the survey data will be used to build a 3D hydrogeological framework and final report.

Study And Data Analysis Underway · Schuyler County; Scotland County; Adair County; Knox County; Clark County; Lewis County; Marion County; Shelby County; Macon CountyJun 24, 2026
Community

Novinger

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Project

U.S. 63 conceptual study between Kirksville and Iowa line: final alternatives work underway

MoDOT is conducting a conceptual study of U.S. 63 between the Iowa state line and south of Kirksville. Public meetings and the May 12–25, 2026 comment period are complete, and final purpose-and-need/conceptual alternatives are in progress for fall 2026. MoDOT states there is currently no construction funding and no implementation timeline has been determined, so this should be treated as a planning study rather than an approved construction project.

Final Conceptual Alternatives In Progress · Schuyler County; Adair CountyNov 1, 2025