Atlanta
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
Search public information
Search questions, communities, public records, documents, projects, official source systems and Missouri’s Watch & Listen directory. Results remain source-labeled and neutral by default.
Ordering note: Most Asked reflects question interest only. It does not imply importance, guilt, quality or editorial priority.
Connected public systems
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
The Missouri PSC order of July 16, 2025 (effective August 15) granted Ameren Transmission Company of Illinois a conditional CCN for the Denny–Zachary–Thomas Hill–Maywood (DZTM) project, including the Denny–Zachary double-circuit route. It permitted a future transfer of an undivided 49% asset interest to the Missouri Electric Commission, but does not prove the transfer occurred. Adair County Commission minutes of September 15, 2026 record statements from Ameren representatives that all Denny–Zachary easements except one in Sullivan County had reportedly been signed, clearing was expected November 2026–January 2027 and construction in 2027. A county road-use agreement, $70,000 protection escrow, dust control and NEMO Fairgrounds haul routes were discussed, not approved or funded in these minutes. No current clearing, complete easements, filed condemnation outcome or signed road agreement is verified. Macon Chronicle reporting dated October 6 says ATXI filed a third Macon County condemnation petition on October 5, 2026 (case 26MA-CC00064), seeking permanent easements over 16 parcels, alongside two August petitions. This is attributed reporting about a petition, not independently verified court relief, an executed easement, or judgment.
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
Official Macon Municipal Utilities notice: a quorum of the Board of Public Works was to attend an October 20, 2026 town hall on water and wastewater improvements, 6:00 p.m. at the Macon County Expo Center, 1303 S. Missouri, Macon. The notice expressly says no votes would be taken.
Verified against U.S. Census Bureau 2020 place-by-county and county geography for Missouri.
Northeast Missouri Electric Power Cooperative's utility factsheet updated November 2026 documents a planned rebuild of approximately 12.2 miles of existing 69-kV line between Axtell Switch Station northwest of Macon and Lovelake Switch Station south of La Plata. New conductor and clearances would accommodate 161 kV, but the initial operating voltage remains 69 kV. Mainly wood H-frames with some steel monopoles are planned. Construction and right-of-way restoration are anticipated in 2027, not confirmed as underway. The utility says the existing 100-foot easement will be used, with no additional right-of-way obtained, but supplemental easements offered; these are not completed land purchases.
Doral Renewables publicly describes a proposed 208-MWac Macon County Solar Project north of Macon. In an October 27, 2026 reporter interview, Doral representative Gerrit Brinks reportedly said that a proposed road-use agreement, development agreement and decommissioning plan had been submitted to Macon County and remained under review, and that the MISO DPP Phase 3 interconnection study was still outstanding. These are attributed developer statements; county receipt, signed terms, approval and any final interconnection outcome are NOT independently verified. The developer's investment, employment and tax numbers are projections, not jobs or revenues achieved.
Official public agenda for prospective closed session following open session; cites legal communications and personnel records, and proposes approval of October 21 closed-session minutes. No outcome established.
Official linked agenda: 5:00 p.m. open session, survey results and financial review; October 21 minutes listed for prospective approval. Scheduled items only.
Original official linked PDF text states a 5 p.m. closed session on November 18 in board room, 902 N. Missouri, prior to the regular open session. Proposed executive-session subjects: legal matters, personnel and personnel records; includes possible approval of Nov 16 closed-session minutes. PDF page-image screenshot was unavailable; text was extracted via public document reader. This is scheduled closed business, not proof of vote or outcome.
Official district agenda index links an open-session Google document for November 18. Document title independently confirmed, but actual agenda text was unavailable from read-only browser extraction. Do not infer meeting-specific topics. District dated calendar separately establishes regular open meeting at 6 p.m. in district board room.
DRAFT / UNAPPROVED official minutes, not approved board minutes. Scheduled 6 p.m.; called to order 6:01 p.m.; open session adjourned 7:10 p.m. Six board members present and one participating by video. Seven motions each identify seven affirmative voters. The published outcome is attributed to this draft, not independently certified as final.
Official district 2026–27 agenda index lists a special open/closed session November 16 and regular open/closed session November 18, 2026. No meeting-specific agendas were linked when checked November 11. Special-session start time and venue were not stated. This is an index of scheduled sessions, not a vote or completed meeting.
Official one-page open-session agenda linked from the district 2026-2027 agenda index: https://www.macon.k12.mo.us/board-of-education/2026-2027-boe-agendas-minutes . Its public text and PDF exports were read and the PDF visually inspected on October 16, 2026, America/Chicago (October 17 UTC). It establishes Wednesday, October 21, 2026 at 6:00 p.m., District Administration Building, 902 North Missouri Street, Macon, Missouri. It includes a public-comment item without a stated signup deadline or procedure. The district meeting calendar supplies the Board Room, main/2nd-floor and front-entrance details: https://www.macon.k12.mo.us/board-of-education/meeting-calendar . Source posting date and meeting end time are not established. Scheduled agenda items are not proof of actions or outcomes.
Developer-controlled primary statement of proposed Macon County 208-MWac solar project and prospective benefits. Estimates are forecasts, not verified taxes or jobs achieved.
Reporter interview attributing to Doral representative the claim that three proposed county agreements were submitted and grid study awaited; no signed agreements or county independent verification supplied.
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.
Missouri DNR’s Northeast Missouri Aquifer Characterization Project covers nine counties: Clark, Scotland, Schuyler, Lewis, Knox, Adair, Marion, Shelby and Macon. DNR says electromagnetic surveys began in 2025 in Clark, Scotland and Schuyler counties and expanded into Adair, Knox and Lewis in summer 2026. The project combines test holes, passive seismic work and airborne electromagnetic surveys to identify suspected buried-channel aquifers and possible potable groundwater sources. DNR says the survey data will be used to build a 3D hydrogeological framework and final report.
October 14, 2026. Start time not stated for this special work session. The official 2026–2027 meeting calendar expressly lists the date; the regular-session time and venue are not being substituted. An event-specific agenda, remote access and public-comment instructions were not verified. No subject, vote or outcome is inferred. Agenda/minutes repository: https://www.macon.k12.mo.us/board-of-education/2026-2027-boe-agendas-minutes . Source publication date: not established. First found and checked: October 14, 2026. Official calendar notice; scheduled meeting, not confirmation that it was held.
Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.