Adair and Sullivan — Zachary–Locust Creek 33-mile co-located 161/345-kV transmission corridor

Northeast Missouri Electric Power Cooperative and NW Electric Power Cooperative's October 2025 factsheet describes a 33-mile route from Zachary Substation south of Kirksville (about 15 miles in Adair County) to Locust Creek Substation west of Milan (about 18 miles in Sullivan County), sharing a corridor with Ameren Transmission Company of Illinois (ATXI). Proposed double-circuit steel monopoles support a cooperative 161-kV line and ATXI 345-kV line. The document specifies overlapping cooperative 100-foot and ATXI 150-foot easements, for a maximum combined corridor width of 150 feet (not 250). Construction is dependent on ATXI's schedule and not independently confirmed begun.

Coordinated Utility Design And Easement Acquisition Period; Actual Signed Easements And Current Construction Status Unverified · Adair County; Sullivan CountyNov 17, 2026
Project

Ameren Missouri / MISO E0013 — 300 MW Sullivan County solar interconnection request

Official MISO records identify E0013 as an active 300 MW photovoltaic solar interconnection request in Sullivan County, Missouri, submitted August 6, 2025 by Union Electric Company d/b/a Ameren Missouri. MISO lists the Zachary-Denny 345 kV line as the point of interconnection, a requested in-service date of June 6, 2028, and the project as not started. FERC records show MISO later filed a second substitute generator interconnection agreement for E0013 on June 30, 2026 under ER26-1085-002. These records establish an interconnection-stage project, not a county permit, recorded land purchase, construction start, or final local approval.

Active MISO ERAS Interconnection Request; Second Substitute GIA Filed At FERC; Local Siting, Land Control, Permits, Financing And Construction Remain Unverified · Sullivan CountyAug 6, 2025
Project

DZTM 345-kV corridor — PSC-approved route; Adair County road and easement negotiations

The Missouri PSC order of July 16, 2025 (effective August 15) granted Ameren Transmission Company of Illinois a conditional CCN for the Denny–Zachary–Thomas Hill–Maywood (DZTM) project, including the Denny–Zachary double-circuit route. It permitted a future transfer of an undivided 49% asset interest to the Missouri Electric Commission, but does not prove the transfer occurred. Adair County Commission minutes of September 15, 2026 record statements from Ameren representatives that all Denny–Zachary easements except one in Sullivan County had reportedly been signed, clearing was expected November 2026–January 2027 and construction in 2027. A county road-use agreement, $70,000 protection escrow, dust control and NEMO Fairgrounds haul routes were discussed, not approved or funded in these minutes. No current clearing, complete easements, filed condemnation outcome or signed road agreement is verified. Macon Chronicle reporting dated October 6 says ATXI filed a third Macon County condemnation petition on October 5, 2026 (case 26MA-CC00064), seeking permanent easements over 16 parcels, alongside two August petitions. This is attributed reporting about a petition, not independently verified court relief, an executed easement, or judgment.

PSC CCN Authorized In 2025; Sept 2026 County Discussions Official; Oct 2026 Macon Condemnation Petitions Attributed To Local Court Reporting; Judgment/Construction Unverified · Adair County; Daviess County; DeKalb County; Grundy County; Knox County; Lewis County; Macon County; Marion County; Randolph County; Sullivan CountySep 15, 2026
Community

Green Castle

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Community

Green City

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Community

Harris

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Community

Humphreys

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Community

Milan

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Document

MISO ERAS Cycle 1 — E0013 Sullivan County solar interconnection request

Official MISO ERAS Cycle 1 record for project E0013. It identifies Union Electric Company d/b/a Ameren Missouri as the interconnection customer/developer, Sullivan County, Missouri as the project location, 300 MW requested NRIS, photovoltaic solar technology, the Zachary-Denny 345 kV point of interconnection, active request status, construction/post-GIA status as not started, and a requested in-service date of June 6, 2028.

Source Verified · Midcontinent Independent System Operator (MISO)Aug 6, 2025
Community

Newtown

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Community

Osgood

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Community

Pollock

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026
Community

Sullivan County

Verified against U.S. Census Bureau 2020 place-by-county and county geography for Missouri.

Published place recordSep 27, 2026
Community

Winigan

Verified against U.S. Census Bureau 2020 Place by County Table for Missouri.

Published place recordSep 27, 2026